Skip to main content
Loading…
This section is included in your selections.

All subdivision improvements must be constructed in accordance with the plans, profiles and cross-Sections herein set forth, and shall be constructed under the general supervision of the City Engineer, and to permanent grades approved by him. In no case shall the subdivision improvements be less substantial than the following requirements

A. Commercial Street. Eighty foot right-of-way, including sidewalks; fifty-four foot street paving;

B. Residential Street. Fifty-foot right-of-way, including sidewalks and planting strips each side; twenty-eight foot street paving;

C. Residential Hillside Street. In areas of subdivisions where the average slope is greater than twenty-five percent, twenty-two foot street paving;

D. Sidewalks, curbs and gutters shall be constructed to the specifications of the City Engineer. (Ord. 89-2 § 2, 1989; Ord. 66 NS § 3.7, 1950; prior code § 20-23.)